Introduction
This interactive simulation will introduce you to the techniques used in three-wire leveling, and will guide you in constructing appropriate, organized, and accurate field notes. Three-wire leveling builds upon the skills learned in differential leveling.
Learning Objectives
Upon completion of this simulation, you will be able to:
- Calculate values required for three-wire leveling (stadia, sums, differences, means)
- Construct field notes appropriate to three-wire leveling
Select the "Simulation" tab above to begin.
This learning object was designed to be fully accessible via mouse, keyboard, and screen reader. The accessibility enhancement adds a beeping sound to indicate when an animation is currently playing. Text descriptions of the animations are provided before and after they play.
Simulation
this is a sample alert box
the specific content here will be changed dynamically to fit the last user action.
Field Notes
| Station | +BSBacksight measurement |
StadiaBS | -FSForesight measurement |
StadiaFS | ElevElevation |
||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 105/ BM |
|||||||||||||||||||||||
| 107 | |||||||||||||||||||||||
| 109 | |||||||||||||||||||||||
| 111 | |||||||||||||||||||||||
| 101 | |||||||||||||||||||||||
| 103 | |||||||||||||||||||||||
| 105 | |||||||||||||||||||||||
| |||||||||||||||||||||||